Leon

Category
Projects

The photovoltaic installation will consist of three solar plants of 50 MWp each, totaling a capacity of 150 MWp. It will be located in the province of Leon and will be built on an area of approximately 300 Ha.

 

The installation will consist of the most advanced solar technology, with 350,384 polycrystalline silicon photovoltaic modules that will occupy a net catchment area of 774,063 sqm. The modules will be mounted on structures with one axis tracking system and the produced direct current will be transformed to alternating current by string inverters.

 

Expected specific production is 1,890 kWh/kWp, to obtain an average annual production of 283.5 GWh, equivalent to an average annual consumption in Spain of 86,644 households.

 

Energy evacuation will be carried out through 30/66 kV elevator transformers, located in high voltage substations in each plant. The substations will have collector/ elevator and collector/ elevator/ disconnector configuration. From the last substation and through a common 132 kV high voltage line, it will connect to an elevator substation (66/400 kV) attached to a transport grid  substation (400 kV), with which will connect through a link line, sectioning the existing 400 kV line.

 

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies