The photovoltaic installation will consist of two solar plants of 50 MWp each, totaling a capacity of 100 MWp. It will be located in the province of Granada and will be built on an area of approximately 211 Ha.
The installation will consist of the most advanced solar technology, with 237,888 polycrystalline silicon photovoltaic modules that will occupy a net catchment area of 525,538 sqm. The modules will be mounted on structures with one axis tracking system and the produced direct current will be transformed to alternating current by string with 174 kVA nominal power.
Expected specific production is 2,135 kWh/kWp, to obtain an average annual production of 213 GWh, equivalent to an average annual consumption in Spain of 66,784 households.
Energy evacuation will be carried out through 30/220 kV elevator transformers located in a high voltage substation common to both plants. The common substation will have a collector/elevator configuration. From this substation, it will connect to the expected renewable position in a planned 220 kV substation of REE through a 220 kV high voltage line.