Malaga

The photovoltaic installation will consist of a solar plant of 250 MWp. It will be located in the province of Malaga and will be built on an area of approximately 575 Ha.

 

The installation will consist of the most advanced solar technology, with 694,444 polycrystalline silicon photovoltaic modules that will occupy a net catchment area of 1,347,221 sqm. The modules will be mounted on structures with one axis tracking system and the produced direct current will be transformed to alternating current by central inverters of 2.5 MW capacity.

 

The expected specific production is 1,952 kWh/kWp, to obtain an average annual production of 488 GWh, equivalent to an average annual consumption in Spain of 150,617 households.

 

The energy evacuation will be carried out through 30/220 kV elevator transformers, located in two high voltage substations of the plant. The substations will have collector/ elevator and collector/ elevator/ disconnector configuration. From these substations, it will connect to a 220/400 kV transformer substation attached to the existing REE substation through a common 220 kV high voltage line. Next, it will connect the planned position in the existing 400 kV substation, through a 400 kV link line.

 

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies