The photovoltaic installation will consist of a solar plant of 103,8 MWp. It will be located in the province of Malaga and will be built on an area of approximately 187 Ha.
The installation will consist of the most advanced solar technology, with 288,000 polycrystalline silicon photovoltaic modules that will occupy a net catchment area of 636,000 sqm. The modules will be mounted on structures with one axis tracking system and the produced direct current will be transformed to alternating current by string inverters with 171 kVA nominal power.
Expected specific production is 2,066 kWh/kWp, to obtain an average annual production of 213 GWh, equivalent to an average annual consumption in Spain of 66,784 households.
Energy evacuation will be carried out through a 30/220 kV elevator transformer, located in the high voltage substation of the plant. The substation will have collector/ elevator configuration. From this substation, it will connect to a 220/400 kV transformer substation attached to the existing REE substation through a common 220 kV high voltage line. Next, it will connect the planned position in the existing 400 kV substation, through a 400 kV link line.